Engineering Design Manual - Loudoun Water (2024)

<strong>Engineering</strong> <strong>Design</strong> <strong>Manual</strong> September 2010

  • Page 3: 44865 LOUDOUN WATER WAY P.O. BOX 40
  • Page 6 and 7: TABLE OF CONTENTS PAGE 2.10 FIELD E
  • Page 8 and 9: TABLE OF CONTENTS PAGE 5.6 PRETREAT
  • Page 10 and 11: TABLE OF CONTENTS PAGE K. Formal Re
  • Page 12 and 13: TABLE OF CONTENTS PAGE Appendix A:
  • Page 14 and 15: Chapter 1: Loudoun Water’s Role 3
  • Page 16 and 17: Chapter 1: Loudoun Water’s Role d
  • Page 18 and 19: Chapter 1: Loudoun Water’s Role T
  • Page 20 and 21: Chapter 1: Loudoun Water’s Role 1
  • Page 22 and 23: Chapter 1: Loudoun Water’s Role W
  • Page 24 and 25: Chapter 1: Loudoun Water’s Role A
  • Page 26 and 27: Chapter 1: Loudoun Water’s Role e
  • Page 28 and 29: Chapter 2: Administration B. Constr
  • Page 30 and 31: Chapter 2: Administration 2.7 Preco
  • Page 32 and 33: Chapter 2: Administration 2.10 Fiel
  • Page 34 and 35: Chapter 2: Administration 3. Provid
  • Page 36 and 37: Chapter 3: Application and Plan Pre
  • Page 38 and 39: Chapter 3: Application and Plan Pre
  • Page 40 and 41: Chapter 3: Application and Plan Pre
  • Page 42 and 43: Chapter 3: Application and Plan Pre
  • Page 44 and 45: Chapter 4: Water Distribution Resid
  • Page 46 and 47: Chapter 4: Water Distribution C. Hy
  • Page 48 and 49: Chapter 4: Water Distribution subdi
  • Page 50 and 51: Chapter 4: Water Distribution a. Pr
  • Page 52 and 53:

    Chapter 4: Water Distribution 2. Re

  • Page 54 and 55:

    Chapter 4: Water Distribution Figur

  • Page 56 and 57:

    Chapter 4: Water Distribution A. Se

  • Page 58 and 59:

    Chapter 4: Water Distribution prote

  • Page 60 and 61:

    Chapter 4: Water Distribution 4.6 I

  • Page 62 and 63:

    Chapter 4: Water Distribution is in

  • Page 65 and 66:

    Chapter 5: Wastewater Collection Ch

  • Page 67 and 68:

    Chapter 5: Wastewater Collection 3.

  • Page 69 and 70:

    Chapter 5: Wastewater Collection 6.

  • Page 71 and 72:

    Chapter 5: Wastewater Collection di

  • Page 73 and 74:

    Chapter 5: Wastewater Collection B.

  • Page 75 and 76:

    Chapter 5: Wastewater Collection 14

  • Page 77 and 78:

    Chapter 5: Wastewater Collection Gr

  • Page 79 and 80:

    Chapter 5: Wastewater Collection 8.

  • Page 81 and 82:

    Chapter 5: Wastewater Collection C.

  • Page 83 and 84:

    Chapter 5: Wastewater Collection 5.

  • Page 85:

    Chapter 5: Wastewater Collection pr

  • Page 88 and 89:

    Chapter 6: Reclaimed Water commerci

  • Page 90 and 91:

    Chapter 6: Reclaimed Water 8. Branc

  • Page 92 and 93:

    Chapter 6: Reclaimed Water 5. Cross

  • Page 94 and 95:

    Chapter 6: Reclaimed Water B. Profi

  • Page 96 and 97:

    Chapter 6: Reclaimed Water C. Sizin

  • Page 98 and 99:

    Chapter 6: Reclaimed Water public a

  • Page 100 and 101:

    Chapter 6: Reclaimed Water 9. Pipe

  • Page 103 and 104:

    Chapter 7: Community Water Systems

  • Page 105 and 106:

    Chapter 7: Community Water Systems

  • Page 107 and 108:

    Chapter 7: Community Water Systems

  • Page 109 and 110:

    Chapter 7: Community Water Systems

  • Page 111 and 112:

    Chapter 7: Community Water Systems

  • Page 113 and 114:

    Chapter 7: Community Water Systems

  • Page 115 and 116:

    Chapter 7: Community Water Systems

  • Page 117 and 118:

    Chapter 7: Community Water Systems

  • Page 119 and 120:

    Chapter 8: Community Wastewater Sys

  • Page 121 and 122:

    Chapter 8: Community Wastewater Sys

  • Page 123 and 124:

    Chapter 8: Community Wastewater Sys

  • Page 125 and 126:

    Chapter 8: Community Wastewater Sys

  • Page 127 and 128:

    Chapter 8: Community Wastewater Sys

  • Page 129 and 130:

    Chapter 8: Community Wastewater Sys

  • Page 131 and 132:

    Chapter 8: Community Wastewater Sys

  • Page 133 and 134:

    Chapter 8: Community Wastewater Sys

  • Page 135 and 136:

    Chapter 8: Community Wastewater Sys

  • Page 137:

    Chapter 8: Community Wastewater Sys

  • Page 140 and 141:

    Chapter 9: Sewage Pumping Stations

  • Page 142 and 143:

    Chapter 9: Sewage Pumping Stations

  • Page 144 and 145:

    Chapter 9: Sewage Pumping Stations

  • Page 146 and 147:

    Chapter 9: Sewage Pumping Stations

  • Page 148 and 149:

    Chapter 9: Sewage Pumping Stations

  • Page 150 and 151:

    Chapter 9: Sewage Pumping Stations

  • Page 152 and 153:

    Chapter 9: Sewage Pumping Stations

  • Page 154 and 155:

    Chapter 9: Sewage Pumping Stations

  • Page 156 and 157:

    Chapter 9: Sewage Pumping Stations

  • Page 158 and 159:

    Chapter 9: Sewage Pumping Stations

  • Page 160 and 161:

    Chapter 9: Sewage Pumping Stations

  • Page 162 and 163:

    Chapter 9: Sewage Pumping Stations

  • Page 164 and 165:

    Chapter 9: Sewage Pumping Stations

  • Page 166 and 167:

    Chapter 9: Sewage Pumping Stations

  • Page 168 and 169:

    Chapter 9: Sewage Pumping Stations

  • Page 170 and 171:

    Chapter 9: Sewage Pumping Stations

  • Page 173:

    Utility Extension Request (UER) Pro

  • Page 176 and 177:

    Water - Plan View 1st sub. 2nd sub.

  • Page 179 and 180:

    Bond Estimate Project Name: Project

  • Page 181:

    Request for Connection Permits Once

  • Page 185 and 186:

    Design of Sanitary Sewers Flows Pip

  • Page 187:

    Appendix C Appendix C: Easem*nts Gu

  • Page 190 and 191:

    D. Blanket Easem*nts The use of “

  • Page 192 and 193:

    submitted by the applicant to Loudo

  • Page 195 and 196:

    Community Systems Key to Abbreviati

  • Page 197 and 198:

    Community Systems Design Review Pro

  • Page 199 and 200:

    Community Systems Project Initiatio

  • Page 201 and 202:

    5. Loudoun Water responsibilities:

  • Page 203 and 204:

    Community Systems Construction Proc

  • Page 205 and 206:

    Community Systems Preconstruction C

  • Page 207:

    Appendix E Appendix E: Corrosion Co

  • Page 210 and 211:

    Class 1 pipelines represent the hig

  • Page 212 and 213:

    . pH values of the soil 50 ppm in

  • Page 214 and 215:

    III. Installation Requirements All

  • Page 216 and 217:

    2. Attach test wires as indicated u

  • Page 218 and 219:

    e. structure that the test wire is

  • Page 220 and 221:

    side of the insulator and a tempora

  • Page 222 and 223:

    e. final anode current output (shun

  • Page 224 and 225:

    Table 2 Field Linear Continuity Tes

  • Page 226 and 227:

    Table 4 Electrical Resistance Sched

  • Page 228 and 229:

    Table 6 Close-Interval Voltage to G

  • Page 231:

    Appendix G Appendix G: Materials Fo

Engineering Design Manual - Loudoun Water (2024)
Top Articles
Latest Posts
Article information

Author: Pres. Carey Rath

Last Updated:

Views: 6543

Rating: 4 / 5 (41 voted)

Reviews: 80% of readers found this page helpful

Author information

Name: Pres. Carey Rath

Birthday: 1997-03-06

Address: 14955 Ledner Trail, East Rodrickfort, NE 85127-8369

Phone: +18682428114917

Job: National Technology Representative

Hobby: Sand art, Drama, Web surfing, Cycling, Brazilian jiu-jitsu, Leather crafting, Creative writing

Introduction: My name is Pres. Carey Rath, I am a faithful, funny, vast, joyous, lively, brave, glamorous person who loves writing and wants to share my knowledge and understanding with you.